I have received a notice and compound from the PBT due to addition/renovation I have made to my home without obtaining the PBT approval first. What are the PBT final action if the compound or notice was not comply?

The council may bring this case to the Court and an offence can be convicted with a fine not more than Ringgit Malaysia fifty thousand (RM50,000.00) or imprisonment for a period not more than three (3) years or both and an additional fine of Ringgit Malaysia One Thousand (RM1,000.00) can be imposed for each offences continue even after the conviction, according to the Section 70 (13), Street, Drainage and Building 1974 (Act 133).

Can I build a structure without an approval from the PBT first?

Section 70 (1), Street, Drainage and Building Act 1974 (Act 133) – Stated that no one can build a structure without written approval from the local authority. All buildings construction or addition /renovation without any approval from the PBT or construction which is not accordance to the approved plan, will be considered as against the Section 70 (Act 133).

Why do I need to obtain approval from the neighbour if I need to make an addition and renovation on the current building?

The neighbour consent letter is necessary if any damage/disturbances happen to the side building during renovation works when it is carried out. If any damages to the side building (joint) occur during the construction, the building owner is responsible to resolve any complaint or problem arise.